What we make
Welding and metal fabrication
MAG 135 and TIG 141 welding — process selection depends on material, thickness, joint type and project requirements. Plus structural assembly, weld dressing and site installation by agreement.

What we fabricate
Fabrication to customer drawings
Production based on approved customer drawings or project documentation.
Read moreRepeat parts and assemblies
Repeat and serial orders using the same fabrication documentation.
Read moreQuality control
Visual inspection (VT) and dimensional control; NDT via partner when required.
Read more
Work usually combined within the same project.
- MAG 135
- Semi-automatic welding for carbon steel structures and welded assemblies.
- TIG 141
- TIG welding for stainless steel and thin-walled parts where applicable to the material and project.
- Installation
- Site installation of structures by agreement with the project schedule.
Welding and assembly
Fit-up of connections, tack welding and post-weld straightening.
Weld dressing and surface preparation for coating.
Send requestRepeat parts and assemblies
Repeat and serial orders using the same fabrication documentation.
Custom welded sub-assemblies for equipment manufacturers.
Send requestQuality control
Visual inspection (VT) and dimensional control; NDT via partner when required.
Send requestTechnical capabilities
- Welding processes
- MAG 135 · TIG 141 — selected by material, thickness, joint type and project requirements
- Processing
- Cutting, drilling, grinding, assembly
- Inspection
- Dimensional control, visual inspection (VT)
- NDT
- Via partner when required by the project specification
- Scope
- Shop welding and site installation by agreement
What we need for a quotation
Drawing or sketch
Dimensions and joints — shop drawing, sketch or on-site measurements.
Material and specification
Material and execution class from the project specification.
Quantity and coating
Number of items and the required coating; coatings via partners.
Schedule and delivery
Target date, delivery location and whether installation is needed.
Materials and documentation
- Structural steel
- Material per drawing; supply forms — plate, tube, section, flat bar and other forms per project specification.
- Stainless steel
- Where the project specifies corrosion resistance or cleanability.
- Aluminium
- Where the project specifies a lighter structure.
- Traceability
- Material certificates and fabrication documentation per project requirements.
Finishing, delivery and installation
- Preparation
- Weld dressing and surface preparation as applicable.
- Coating per project
- Coating — hot-dip galvanizing, painting or powder coating — is selected per the project specification and requirements.
- Coating at partners
- External coating work is coordinated through partners.
- Delivery
- Fabrication in Tallinn; delivery for projects across Estonia and Europe by agreement.
- Installation
- Site installation by agreement, based on project scope and schedule.
Documented welding scope of the TÜV Eesti EN 1090 EXC2 / ISO 3834-2 certificates: process 135, steel groups 1.1 and 1.2. TIG 141, stainless steel and aluminium are separate fabrication capabilities, not covered by these certificates.
Frequently asked questions
- Which welding processes do you use?
- MAG 135 and TIG 141. Process selection depends on material, thickness, joint type and project requirements, and is agreed from the project documentation.
- Can you weld customer-supplied material?
- Yes, by agreement. Material conformity and certificates must be provided.
- Do you perform NDT?
- Non-destructive testing is ordered from a partner when the project specification requires it.
Send drawings and request a quotation
Send your drawings or a technical specification — we review the scope and come back with a quotation.
PDF / DWG / DXF
